-
Mental Deteriorated Blacking:• An Regular Day, before a Full Shutdown of Power was permitted into the Entire Underground Facility and unfortunately it’s Backup Generator failed to start up – which by this Point a Few Flesh have breached through Security Points and started Terrorizing the Facility Members before more Pouring through, those who died will never see their Loved Ones and those who survived will now have to deal with the Flesh after sustaining Injuries.
• An Response Team was sent out a Few Hours afterwards, 2/3rd of the Facility Members perished on this Day – Both a Trauma for the Survivors and an Ever Growing Hatred for Everyone.


